European Commission, Directorate-General Regional Policy
South Eastern Motorway, Dublin

Review of EIA (
Concerning Carrickmines Castle, a.k.a. 'The Kampsax Report')
July 2003

Table of Contents

 1  Background  1
 2  Requested assignment  3
 3  Background Considerations  5
 3.1  EIA Legislation  5
 3.2  Background of archaeological legislation and practice  7
 4  Narrative of events  11
 4.1  Introduction  11
 4.2  Pre-EIS studies (1983-1997)  11
 4.3  The Environmental Impact Statement  17
 4.4  Consultation  20
 4.5  Project Approval  22
 4.6  Fieldwork prior to construction  22
 5  Review of developer information  26
 5.1  EIS in general  26
 5.2  Cultural Heritage Scope  29
 5.3  Buildings and structures [4.4.3 above]  30
 5.4  Archaeology [4.4.4 above]  31
 6  Conclusions  34
 6.1  Findings  34
 6.2  Observations  37
 6.3  Uncertainties  39
 7  Appendix I: References  41
 8  Appendix II: Documents Outlining the Sequence of Events  43
 9  List of abbreviations  48
     

DOWNLOAD WORD VERSION


 

Report no.      1
Issue no.         1
Date of issue   July, 2003
Prepared         Julian Munby (Oxford Archaeology), S?en Hinge-Christensen


Checked         Anne Eiby


Approved       Raphael Zayat
 

   
Library Home Report